Renkertobel

Composite steel bridge manufactured using the incremental launching method

Location |

Obermaiselstein – Balderschwang

Client |

Oberallgäu District Office

Service |

Structural Engineering Inspection

Category |

Completion |

2016

Description

New construction of a composite steel bridge over the Renkertobel as part of the expansion of the OA9 district road from Obermaiselstein to Balderschwang in construction section 10. The superstructure is planned as a single-span girder with a span of 86.40 m and runs in a straight line over the valley incision. The gradient has a longitudinal slope of 2.2% towards Balderschwang.
The bridge cross-section is designed as a two-web plate girder consisting of two tightly welded steel boxes and the lightly reinforced reinforced concrete roadway slab in composite construction. The structural height of the superstructure is approx. 4.25 m at the abutments, with the box-shaped webs being manufactured with a slight fillet (stitch ~25 cm) on the underside. The two box webs are coupled to each other at every second cross bulkhead. The steel superstructure was manufactured using the incremental launching method via a centrally arranged auxiliary support in the Tobel.

Special features

  • Structural Engineering Inspection of Stability, Construction States, Auxiliary Structures, Random Construction Supervision of Falsework
  • Location: Riedbergpassstraße at the Renkertobel pass, Oberallgäu, Bavaria
  • Dimensions:
    Single-span girder with a length of 84.60 m
    Width between the railings: 10.70 m
    Service period: 2013-2015