Albvorland Tunnel (Small Wendlingen Curve)

Planning of tunnel and structural engineering works and earthworks

Location |

Wendlingen am Neckar, Baden-Württemberg

Client |

DB Projekt Stuttgart Ulm GmbH

Service |

Execution planning

Category |

Rail

Completion |

2020

Description

The construction project is part of the overall Albvorland Tunnel project of the Wendlingen – Ulm railway line and includes the construction of the single-track branch line “Small Wendlingen Curve”. The Small Wendlingen Curve serves to connect the NBS to the existing Neckartalbahn (Stuttgart-Tübingen).
The Small Wendlingen Curve is a total of 818.0 m long and consists of a 494.0 m long tunnel structure, which is partly built using mining methods and partly using open construction methods. To the north, a 145.0 m long trough structure adjoins.
In addition to the execution planning of the tunnel and engineering structures, the earthworks for the open route were also planned.

Special features

  • Shotcrete excavation with undercutting of surface waters and a gas pipeline with shallow overburden